Skip to main content Go to contact form
Devco II

Sinopec – Sulfur Forming Facility

Location: Puguang, China

Matrix PDM Engineering was awarded a contract to build an 8,600 ton per day sulfur forming facility for Sinopec for the Puguang Gas Project. This facility utilizes the Devco II Sulfur Forming Process. Matrix PDM also provided technical assistance for the sulfur handling system.

This facility is China’s first large-scale sulfur export facility. An important step in large scale sulfur production was the adoption of a national standard for Premium Sulfur Product. This standard (GB-T 2449-2006 Sulfur for Industrial Use) mandates moisture content and particle size, which are both met by the Devco II Process.

1st
large-scale sulfur export facility in China
8600
tons/day total sulfur forming capacity
100%
commitment to safety

Scope of Work

  • Engineering and Design
  • Sulfur Forming
  • Material Handling
Sinopec
Devco II
Engineering
Sulfur Forming

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.
return to top icontop