Skip to main content Go to contact form
Natural Gas Plant

Confidential Client – Gas Processing Facility – West Texas

Location: West Texas

Matrix PDM Engineering developed an EPC solution leveraging our gas processing expertise, partnerships with key process equipment suppliers, and our modular design approach that allowed our team to deliver an operating facility on schedule.
A modular design, fabrication, and construction strategy allowed us to shorten the schedule and reduce risk and on-site construction time to bring the site online and to market faster; time to market was key for our client and their needs.

1050GPM
amine treater
15.5GPM
Triethylene Glycol dehydrator
30000SCFM
Regenerative thermal oxidizer

Scope of Work

  • Cryogenic plant with refrigeration liquid product treating
  • 1,050 GPM amine treater
  • (2) 15.5 GPM Triethylene Glycol dehydrators
  • 30,000 SCFM regenerative thermal oxidizers
  • Emergency flare system
  • Residue gas compression
  • Liquid stabilizer
  • Slug catcher

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.
return to top icontop