GCC – Rail to Truck Cement Storage Distribution – Henderson, SD
Location: Henderson, Colorado
Matrix PDM engineered rail to truck cement storage expansions at GCC 's Irondale cement distribution terminal. To increase the storage capacity to 50,000t. Engineering services included electrical, mechanical and structural design.
5100yd3
of top soil and lean clay
50000t
storage capacity
100%
commitment to safety
Scope of Work
- Worked with GCC for project feasibility studies to determine the most effective method for improving facility operations
- New layout to redirect truck route and rail unloading at Irondale
- Dealt with height restrictions and lowered the dome 10 feet and the reclaim tower 25 feet
- Removed 5,100 yd3 of top soil and lean clay at Irondale
- Deep foundations under the reclaim tunnel and around perimeter of dome
- Design of 40 4-foot diameter caissons every 16 feet under storage dome